|
Projects |
|
Projects - Singapore |
|

SK Engineering & Construction. Excavation and construction of Ang Mo Kio Shaft for the North South Transmission Cable Tunnel. 2013/14
 |
|

SK Engineering & Construction. Excavation and construction of Dunearn and Holland Shafts for the East West Transmission Cable Tunnel. 2013/14
 |
|

Samsung C&T Corporation. Construction of Gambas Shaft for the North South Transmission Cable Tunnel. 2013
 |
|

PUB Woodlands T2119A Sewer Diversion Works Ley Choon Group Holdings Limited.
 |
|

JIPCT TC130113 – Jurong Island to Pioneer Transmission Cable Tunnel
 |
|

Penta – Ocean Construction Co. Ltd. 420m twin 5 lane road tunnels that passes under the Marina bay seabed. 2013
 |
|
Projects - Global |
|

Curtain grout approximately 14,000 LF of the A Line Tunnel Track 1 and Track 2 (419+00 to 439+00 and 452+15 to 502+50).
 |
|

Curtain grout critical public/non-public area of underground stations and tunnels throughout NYCT system.
 |
|

Under the executive order #221, Curtain grout to replace the severely deteriorating waterproofing at some of the most critical Tunnels...
 |
|

Leak mitigation grouting on as-needed basis for newly constructed OLRT tunnels and stations between Rideau Station and Lyon Station.
 |
|

As part of enhancing 24 critical NYCT Stations with service life of close to 100 years, Sovereign was tasked as the specialist for designing...

 |
|